Date Description Inspector Results Comments
02/10/2017 EXCAVATION/LAYOUT REBAR & ZON Approved
01/19/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval ENTRY FLOOR OK TO POUR
01/04/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK TO POUR FOOTINGS AT COMPACTOR AND AT ENTRY KNEE WALLS.
12/29/2016 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection
12/14/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval DELI AREA OK TO POUR.
12/07/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SW CORNER OFFICE, PHARMACY, RESTROOM AREA OK TO POUR.
12/06/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FLOOR FROM D TO E / 4.4 TO 6 (NE CORNER) OK TO POUR
12/05/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK TO BACKFILL FIRE RISER
12/02/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval EAST SIDE WALK OK TO POUR
11/30/2016 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection
11/23/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTING AT 4.4/D ELEVATED 1'6" OK TO POUR
11/17/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval WEST SIDE TEMPORARY WALL FOOTING OK TO POUR
11/09/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING DOCK AREA WALLS GL: 4.4/E - D.3; E/4.4 - 2.5; D.3/ 4.4 - 2.5; 3.4/D.3 - D; D.3/3.4 - 2.5; 2.5/D.3 - D. OK TO SET FORMS AND POUR WALLS.
11/08/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval WEST SIDE OF PROPERTY; 5 COLUMN FOOTINGS FOR SCREEN WALL. OK TO POUR FOOTINGS.
11/07/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CMU WALLS AT 0" - 48" AFFE AT GL: A/ 1 - 6'; 6/ A - A.5; OK TO GROUT PROGRESS AREA.
11/03/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING DOCK LINE E FOOTING OK TO POUR.
11/02/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING DOCK 4.4 D TO 4.4 E
GRID LINE D AND D.3 FROM 4.4 TO 2.2
OK TO POUR FOOTINGS
11/01/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTINGS AT NE CORNER OF PAD OK TO POUR.
10/31/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval INTERIOR FOOTINGS OK TO POUR
10/28/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GRID LINE 1 FROM A.9 TO D
GRID LINE 6 FROM A.9 TO C.5
GRID LINE D FROM 1 TO 2.2
ALL OK TO POUR
10/27/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval ALL FOOTINGS FROM A.9 WEST OK TO POUR
10/11/2016 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection OVER-X WILL BE COMPACTION TESTED AND RECORDED BY OTHERS.