Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2016 | ENGINEERING - FINAL | Approved | HC PARKING DOES NOT MEET ADA ACCESSIBILITY STD'S; HOWEVER THE SITE HAS BEEN APPROVED BY THE CITY OF TUCSON BUILDING OFFICIAL, CLAYTON TREVILLYAN. | |
| 03/15/2016 | ENGINEERING - FINAL | Not ready for Inspection | THE CONTRACTOR HAS NOT PROVIDED ANY INFORMATION FOR NEEDED CHANGES TO THE PREVIOUS MENTIONED ISSUE. CLAYTON TREVILLAN HAS MADE A DETERMINATION THAT THE OWNER HAS COMPLETED THE REQUIRED MONEY ON THE INTERIOR IMPROVEMENTS AND THE EXTERIOR REQUIREMENTS ARE NOT WARRANTED AT THIS TIME. | |
| 02/16/2016 | ENGINEERING - FINAL | Not ready for Inspection | LOOKED AT THE PLANS ON THE SITE ONCE IT WAS NOTED THAT THE PEDESTRIAN ACCESS RAMP EXTENDS OUT INTO THE PAAL. PER THE APPROVED PLANS THIS RAMP IS NOT SHOWN ON THE PLAN AND THERE IS NO OTHER ACCESS FROM THIS ACCESS ISLE FOR HANDICAP ACCESS. I HAVE ASKED THE CONTRACTOR TO MAKE THIS ISSUE AWARE TO THE ENGINEER OF RECORD AND ASK THAT HE GOES DOWN AND MEET WITH STEVE SHIELDS AND DISCUSS WHAT MODIFICATIONS WILL BE REQUIRED TO THE PLANS. THIS WILL BE RE-INSPECTED AT A LATER DATE TO ENSURE THAT ACCESS HAS BEEN PROVIDED. |