Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 03/03/2017 | PLUMBING - ROUGH, SOIL | Partial Approval | 1- DWV WATER TEST PROVIDED. 2- BLDG SEWER HAS BEEN CONNECTED TO THE EXISTING SEPTIC TANK, TRACER WIRE PROVIDED. 3-SHALL PROVIDE THE APPROVED SET OF DRAWINGS ON SITE AT THE TIME OF THE NEXT INSPECTION. 4- OKAY TO COVER AT YOUR OWN RISK. |