Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 08/16/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | ||
| 08/12/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | These are notes from NS: PARTIAL APPROVAL All C900 pipe and tracer tha is already in place with thrust blocks may be back filled. An c 900 still to be laid ( on the East permimeter) may be back filled if no thrust block is need. Still needs 200 lb test |
|
| 08/12/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Following up on NS inspection. East end approved. OK to backfill. 3stubups and thrust blocks. Still need to visualize remaining stubups and thurst blocks for risers only. | |
| 08/09/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | cancelled. not ready. | |
| 07/26/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | 1. Need to pull separate underground permit. |