Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2015 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/28/2015 | PLUMBING - FINAL | Not ready for Inspection | FACTIRY COATED PIPE REQUIRED. FIELD WRAP JOINTS ONLY USE PRIMER UNDER TAPE CONNECT TO HOUSE, TEST ENTIRE SYSTEM PROVIDE BONDING CORRECT ELECTRICAL GROUND 2 GROUND RODS REQUIRED METAL PIPE HAS BEEN CHANGED TO PLASTIC. EXTEND B VENT TO ABOVE COOLER RAIN CAP TERMINATE RELIEF VALVE CARBON MONOXIDE DETECTOR REQ |