Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T15CM06456
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2017 | ELECTRIC - INTERMEDIATE | Approved | ||
| 08/01/2017 | ELECTRIC - INTERMEDIATE | Partial Approval | PANELS, SWITCH GEAR, TRANSFER SWITCHES: SEF-A; UA1; SWITCH ATS; G8; SWG (TD-1); SWGR-A; TA1; MA1 4 EACH 800 AMP BREAKERS. | |
| 06/01/2017 | ELECTRIC - INTERMEDIATE | Partial Approval | NINE PANELS INSPECTED - NEED TO MIGRATE FEEDERS IN FROM EXISTING PANELS: PANELS: P-LMA-BB3, P-LMA-GBE; P-LMA-GM2, P-LMA-1B3, P-LMA-1M2, P-LMB-2B3, P-LMB-3B4, P-LMB-3M3, L-LMP-4B4 | |
| 03/28/2017 | ELECTRIC - INTERMEDIATE | Partial Approval | PANELS PDSC, ACPBD-REFEED AND REPLACE BREAKERS. CHILLERS CCC-AB, MCC-2 RE-FEED TO SOURCE. |
|
| 02/16/2017 | ELECTRIC - INTERMEDIATE | Partial Approval | PANEL #1 P-LHB-GG10; TRANSFER SWITCHES: #1 ATS-HSB1-GK8; #2 ATS-HSB1-GK8. OK TO ENERGIZE EQUIPMENT. | |
| 02/08/2017 | ELECTRIC - INTERMEDIATE | Partial Approval | SWICHE GEAR B PARTIAL SES B ATS B, NEEDS TO REMOVE TEMP POWER AND INSTALL EMERGENCY BACK UP POWER |
|
| 11/29/2016 | ELECTRIC - INTERMEDIATE | Partial Approval | GROUND CABLE TO OFFICE #1 CAD WELDED TO MAIN GROUNDING SYSTEM. OK TO COVER PROGRESS AREA. | |
| 09/13/2016 | ELECTRIC - INTERMEDIATE | Partial Approval | OKAY TO CLOSE AND ENERGISE PENDING 3RD PARTY TORQUE REPORTS.HMB1-GJ8, HMA1-GJ9, HHB1-GK8, AND HHA1-GK9. | |
| 08/16/2016 | ELECTRIC - INTERMEDIATE | Partial Approval | OKAY TO CLOSE SWTICH GEAR SECTIONS "HDB1-3D1" AND "HDA1-3E1", 3RD PARTY HAS TORQUE RESULTS, FINAL CONNECTIONS NOT EXPECTED TO BE INSPECTED FOR 3-4 WEEKS, HI-POT TESTS WILL BE EMAILED TO ME. |