Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/03/2017 |
ENGINEERING - FINAL |
|
Approved |
|
| 12/09/2016 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
INSTALL TRASH ENCLOSUER PER AP PLANS OR HAVE COT APPROVEAL TO REMOVE FROM PLANS. PROVIDE 5' LANDING AT TOP OF RAMP AND PROVIDE LANDING AT BOTTOM. |
| 07/07/2016 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
(DP15-0144) WALKED SITE WITH GC WENT OVER WORK THAT NEEDS TO BE DONE FOR FINAL. INSTALLING SIDEWALK RAMP PER CODE. ALL DRAINAGE PER AP PLANS LOADING ZONES. BIKE PARKING. LIST NOT COMPLET. AND ALL NOTES FROM 5/20/2016. |
| 05/20/2016 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
NEW SIDEWALK OVER 2% CROSS SLOPES AND SIDEWALK FROM 25 STREET OVER 2% CROSS SLOPES. INSTALL ADA SIGN PER KEY NOTES AND COMPLET ALL KEY NOTES ON AP PLANS. LIST MAY NOT BE COMPLET. |