Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2015 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 12/04/2015 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 15 PSI GUAGE RP ACCES 5' MAX |
|
| 11/16/2015 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 10/30/2015 | PLUMBING - INTERMEDIATE | Partial Approval | OKT O BACKFULL AT GREASE INTERCEPTOR | |
| 10/29/2015 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 10/06/2015 | PLUMBING - INTERMEDIATE | Partial Approval | OK TO BACKFILL AND POUR PLUMBING TRENCHES. BE SURE TO WRAP PVC PRIOR TO POURING OK TO BACKFILL ELEC | |
| 10/05/2015 | PLUMBING - INTERMEDIATE | Not ready for Inspection | THIS IS A SOIL INSPECTION PROVIDE FULL SIZED CLEAN OUTS EACH DRY VENT SHALL RISE VERTICALLY TO 6" ABV FLOOD LEVEL AND CONNECT TO DRAIN ABV FLOOR LINE CORRECT TR LAYOUT |