Permit: T15CM05730

Parcel: 138244030


Addresses:

1795 W VALENCIA RD


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T15CM05730

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
07/18/2017 ENGINEERING - FINAL Approved
12/07/2016 ENGINEERING - FINAL Partial Approval INSTALL PER PAGE 15 OF 21 TREE PLANTING DETAIL #3 AND COMPLET INSTALL OF ALL LANDSCAPEING ON AP PLANS. PROVIDE STABILIZATION ON ALL DISTURBED SOIL . PROVIDE MONITORING REPORT. COMPLET INSTALL OF ALL BIKE PARKING. REMOVE ALL CONSTRUCTION EQUIPMENT FROM PARKING AREAS.
12/05/2016 ENGINEERING - FINAL Continued
12/01/2016 ENGINEERING - FINAL Not ready for Inspection
11/08/2016 ENGINEERING - FINAL Continued ENGINEERING OK WITH TEMP C OF O FOR STOCKING ( ONLY).
11/01/2016 ENGINEERING - FINAL Continued WALKED SITE WITH GC WENT OVER PARKING AREAS THAT ARE OVER 2%. AND WORK THAT NEEDS TO BE COMPLET FOR FINAL.
10/06/2016 ENGINEERING - FINAL Continued
09/30/2016 ENGINEERING - FINAL Continued GROUT FOR TRASH ENCLOUER OK. 2'6'' WALL ON NORTH SIDE OF SITE OK. LAST GROUT ON WALL ON SOUTH SIDE OF SITE
09/30/2016 ENGINEERING - FINAL Continued
08/29/2016 ENGINEERING - FINAL Continued INSPECTION PER HIGHLIGHS ON PAGE C3.30.
08/29/2016 ENGINEERING - FINAL Continued MET WITH THE CONTRACTOR AND LOOKED AT THE FOLLOWING ITEMS FOR GROUT: 10 THE CMU WALL SOUTH OF THE FUTURE ROADWAY ALONG THE SOUTH SIDE OF THE PROJECT, LOCATED WEST OF THE CONSATRUCTION TRAILOR FOR APPROXIMATELY 100 FEET. 2) THE CMU WALLS FOR THE TRASH ENCLOSURE. BOTH OF THESE AREAS HAVE BEEN APPROVED FOR THE 1ST 4 FOOT LIFT OF THE WALLS.
ALSO LOOKED AT THE STEEL FOR THE RETAINING WALL ALONG THE NORTHSIDE OF THE PROJECT SOUTH OF THE DRAINAGE CHANNEL BETWEEN INDIAN AGENCY ROAD AND THE EAST DRIVEWAY OFF OF VALENCIA, THIS AREA WILL BE POURED LATER TODAY.
08/29/2016 ENGINEERING - FINAL Continued CHECKED THE REBAR IN THE RETAINING WALL FOOTER ALONG THE SOUTHSIDE OF THE CHANNEL LOCATED AT THE NORTHEAST CORNER OF THIS SITE. THE CREW HAS BEEN CLEARED FOR THE POURING OF THE FOOTER
08/25/2016 ENGINEERING - FINAL Continued INSPECTION PER HIGH LIGHTS ON PAGE C3.10.
08/22/2016 ENGINEERING - FINAL Continued CCREEN WALL INSPECTION PER HIGH LIGHTS ON PAGE C3.10.
08/18/2016 ENGINEERING - FINAL Continued PER HIGHT LIGHTS ON PAGE C3-10 .
08/17/2016 ENGINEERING - FINAL Continued #4 REBAR IN SCREEN WALL 32'' ON C PER HIGH LIGHTS ON AP PLANS.
08/12/2016 ENGINEERING - FINAL Continued REBAR FOR SCREEN WALL PER HIGH LIGHTS ON PAGE C2-2.
08/11/2016 ENGINEERING - FINAL Continued
08/10/2016 ENGINEERING - FINAL Not ready for Inspection
08/09/2016 ENGINEERING - FINAL Not ready for Inspection
08/03/2016 ENGINEERING - FINAL Not ready for Inspection
08/03/2016 ENGINEERING - FINAL Not ready for Inspection
07/29/2016 ENGINEERING - FINAL Continued SWPPP CONTROLS HAVE BEEN REPAIRED.
07/12/2016 ENGINEERING - FINAL Continued MET WITH GC ABOUT SWPPP REPAIRS ON NORTH WEST SIDE OF SITE. KEEP A EYE ON TRACK OUT.
06/30/2016 ENGINEERING - FINAL Continued NOTES ON DP15-0126.
06/27/2016 ENGINEERING - FINAL Continued STORM WATER PIPING PER HIGH LIGHTS ON PLANS.
06/24/2016 ENGINEERING - FINAL Continued NOTES ON ACTIVITY# DP15-0126
06/23/2016 ENGINEERING - FINAL Continued
06/22/2016 ENGINEERING - FINAL Continued
06/20/2016 ENGINEERING - FINAL Continued
06/20/2016 ENGINEERING - FINAL Partial Approval CREWS ARE WORKING ON THE PLACEMENT OF REBAR FOR THE WALLS AND ROOF OF BOX CULVERT #1, IT IS APPROVED AT THIS TIME FOR THE PLACEMENT OF CONCRETE, THIS IS EXPECTED TO BE POURED TOMORROW MORNING.
06/14/2016 ENGINEERING - FINAL Not ready for Inspection
06/14/2016 ENGINEERING - FINAL Continued THE CREW IS TIEING THE STEEL FOR THE FOOTES AND THE FLOOR SLAB OF BOX CULVERT #1, THIS APPROVED AT THIS TIME FOR THE POURING OF THE CONCRETE.
06/13/2016 ENGINEERING - FINAL Continued RETAINING WALL ON EAST SIDE OF SITE PER AP PLAN FOR REBAR.
06/06/2016 ENGINEERING - FINAL Continued BOX CULVERTS HEAD WALLS / WING WALLS ON VALENCIA PER CULVERT DRAWING.
06/02/2016 ENGINEERING - FINAL Continued RESCHEDULED FOR A LATER DATE
05/23/2016 ENGINEERING - FINAL Continued
05/20/2016 ENGINEERING - FINAL Partial Approval LOOKED OVER THE SITE TO SEE WHAT WORK IS HAPPENING AT THIS TIME. THE CREWS ARE CURRENTLY WORKING ON THE INSTALLATION OF THE REBAR FOR COR THE FOOTERS FOR THE CULVERTS #1 & #2 SOUTH VALENCIA FOR THE ROADWAYS INTO THE SITE. THEY ARE REMOVING ALL OF THE LOOSE MATERIAL FROM WITHIN THE FOOTER AREAS AND WILL BE READY FOR THE PLACEMENT OF CONCRETE LATER ON THIS MORNING.
05/18/2016 ENGINEERING - FINAL Continued INSTALLED NEW ENTRANCE ON EAST SIDE OF SITE. WORKING ON BASIN PIPING ON NORTH SIDE OF SITE.
05/18/2016 ENGINEERING - FINAL Continued
05/09/2016 ENGINEERING - FINAL Continued NO SWPPP CONCERNS AT THIS TIME.
04/27/2016 ENGINEERING - FINAL Continued WALKED SITE NO CONCERNS AT THIS TIME.
04/25/2016 ENGINEERING - FINAL Continued REBAR FOR NORTH EAST BOX CULVER WING WALL INSTALLED.
04/25/2016 ENGINEERING - FINAL Not ready for Inspection PAGE A-1 NEEDS TO BE COMPLE PER ZONING.
04/11/2016 ENGINEERING - FINAL Continued 1) CREWS WORKING ON THE POURING OF CONCRETE FOR THE NORTHERN BOX CULVERT ON INDIAN AGENCY ROAD. 2) CREW WORKING ON INSTALLING THE WATER LINE AT THE NORTH WEST CORNER OF THE SITE BEHIND BIG O TIRE, THIS WORK IS BEING INSPECTED BY THE WATER DEPARTMENT.
04/07/2016 ENGINEERING - FINAL Continued BOX CULVERTS REBAR INSTALLED PER DRAWING .
04/06/2016 ENGINEERING - FINAL Continued HDPE STROM WATER PIPING PER HIGH LIGHTS ON AP APLANS. TALKED TO GC ABOUT PIPING COVER.
04/05/2016 ENGINEERING - FINAL Continued NO CHANGES FROM LAST INSPECTION.
04/04/2016 ENGINEERING - FINAL Continued TOP MAT ON BOX CULERT ON SOUTH EAST SIDE OF SITE PER DRAWINGS. HDPE STORM DRAIN PIPING PER HIGH LIGHTS ON AP PLANS. MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS ON WEST SIDE OF SITE.
04/01/2016 ENGINEERING - FINAL Continued HDPE 24'' TO 18'' PER HIGH LIGHTS FOR STROM WATER ON AP PLANS.
03/30/2016 ENGINEERING - FINAL Continued WORKING ON SOUTH WEST SIDE OF SOUTH BASIN. WORKING ON WALLS FOR BOX CULVERTS. WORKING ON PIPING NORTH WEST BASIN.