Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2016 | FIRE SPKLR - FINAL | Approved | ||
| 02/01/2016 | FIRE SPKLR - FINAL | Partial Approval | Fit ceiling tile to coverplate so there is no gap around the plate on the second floor ( 2 heads East of the demising wall). Passed -Flow Test - alarm in 47 sec ( outside bell at 25 sec) Passed -2 inch main drain test - static was 80 psi, dropped to 75 psi, required is 48.4 psi. PARTIAL APPROVAL: 1. Waiting for appeal to be approved for no heads added to the bottom of the elevator shaft. 2. bathroom stall-door frame is blocking the spray pattern of the head that is located on the bottom of the soffit in the womens downstairs restroom. |