Inspection Status: Approved
Inspection History: SIGN - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/02/2016 |
SIGN - FINAL |
|
Approved |
|
| 11/18/2015 |
SIGN - FINAL |
|
Partial Approval |
A PARTIAL FOR THE SITE HAS BEEN GIVEN AT THIS TIME, ADDITIONAL INSPECTIONS OF THE SITE WILL BE REQUIRED PRIOR TO THE PERMIT BEING FULLY APPROVED. CURRENTLY THE CONTRACTOR IS WORKING ON THE 6TH FLOOR, BUT ALSO HAS THE PERMIT WORK ON THE 5TH FLOOR TIED TO THIS SAME PERMIT. THIS SITE IS OKAY FOR A TEMPORARY C OF O FOR THE 6TH FLOOR ONLY AT THIS TIME. |