Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - HYDRONIC PIPING
Permit Number - T15CM04368
Inspection Description - MECHANICAL - HYDRONIC PIPING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2016 | MECHANICAL - HYDRONIC PIPING | Approved | IVRS - Inspection :* | |
10/14/2016 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1- CHS,CHR,HWR,HWS SYSTEMS HYDROSTATIC PRESSURE TEST WAS PROVIDED FROM THE PENTHOUSE #21100 TO THE P.O.C. AS NOTED ON PLAN. 2- HYDRONIC COPPER PIPING IS OKAY IN PENTHOUSE #21100 FOR BCU-2. |
|
09/22/2016 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* | |
09/20/2016 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* | |
09/13/2016 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1- AIR PRESSURE TEST PROVIDED FOR THE HYDRONIC SYSTEM FOR VAV'S ST-6,ST-7,ST-25,ST-3,ST-19,ST-20,ST-21,ST-22 AND THIS TEST WAS GOOD ALL THE WAY UP TO THE ISOLATION VALVES THAT ARE LOCATED IN THE CENTER NORTH CORRIDOR. |
|
09/12/2016 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1- AIR PRESSURE TEST PROVIDED FOR THE OVERHEAD HYDRONIC AND VAV SYSTEM FROM THE VALVES LOCATED AT THE CENTER NORTH CORRIDOR TO VAV NUMBERS 1,2,26,23,28,24,17,18,16,15,14,11,12,AND 13. INTERIOR HYDRONIC PIPING OK TO COVER. 100 PSI HYDROSTATIC TEST OK. |