Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2015 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/07/2015 | PLUMBING - FINAL | Not ready for Inspection | SUPPORT WTR PIPING ABV COILING COMPLY WITH PREVIOUS NOTES FIXTURE MAY NOT BE DOUBLE TRAPPED |
|
| 08/12/2015 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/12/2015 | PLUMBING - FINAL | Not ready for Inspection | FIXTURE REQUIRES A VENT. PLAN SPECIFIES A 2" WASTE AND VENT. PROVIDE PROPER USE OF DRAINAGE FITTINGS. INSTALL CLEANOUT SHOWN. INSTALL PIPE SUPPORTS. PROVIDE A 6' LADDER | |
| 07/01/2015 | PLUMBING - FINAL | Not ready for Inspection | NO PLANS ON SITE PROVIDE ACCESS TO TIE IN. DIRECT CONNECTION TO DWV SYSTEM IS REQUIRED.DRAINAGE FITTINGS ARE REQUIRED PROVIDE PROPER SLOPE CONNECTION TO WALL SHALL BE SEALED. ALL CO JOINTS SHALL BE DEBURRED AND EXCESS FLEX SHALL BE REMOVED |