Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T15CM04286
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | Note: The underground for buildings #, 2, 3, 4 & 5 are on permit # T15BU01198. This section of underground was not included on those plans because this development is being completed in phases and the plans specifically say " Not part of these plans". The Weitz company called this UG Piping and Hydro Inspection in under the General contractors permit # T15CM04286.The piping looks good and the pressure test was passed ( 220 psi for 2 + hours), however there will be no flush on this underground until a seperate permit/plans are submitted for these 28 feet of 6" DIP that has already been installed. You may backfill at your own risk, understanding that any changes that may be required if these plans are not approved may require you to uncover the pipe and reinstall. This underground is located on the West side of this development and runs from the 8 inch water main to the riser of Building # 6. |