Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T15CM04286
Inspection Description - FRAMING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2017 | FRAMING | Approved | ||
| 11/01/2016 | FRAMING | Partial Approval | OK TO SHEETROCK KITCHEN. | |
| 09/26/2016 | FRAMING | Partial Approval | OK TO COVER WALLS IN AREA 1 | |
| 09/23/2016 | FRAMING | Cancelled | ||
| 09/19/2016 | FRAMING | Partial Approval | OK TO CLOSE WALLS IN AREA 4 | |
| 09/14/2016 | FRAMING | Partial Approval | FIRST FLOOR AREAS 2 AND 3 OK TO CLOSE WALLS EXCEPT PLUMBING WALLS NOT TESTED YET. FIRE STOPPING AT SECOND FLOOR EXTERIOR WALLS AREA 5 OK TO COVER. |
|
| 09/09/2016 | FRAMING | Partial Approval | AREA 5 (2ND FLOOR) FROM SOUTH END TO ST235/236 OK TO INSULATE AND DRYWALL EXTERIOR WALLS. | |
| 09/08/2016 | FRAMING | Cancelled | ||
| 08/04/2016 | FRAMING | Partial Approval | RATED SHAFTS IN HOSPICE AREA OK TO COVER | |
| 07/22/2016 | FRAMING | Partial Approval | RC OK ON WEST AND NORTH WINGS. | |
| 07/05/2016 | FRAMING | Cancelled | ||
| 07/05/2016 | FRAMING | Partial Approval | OK TO SHEATH NORTH FACE AND COURTYARD OF BUILDING 6 | |
| 06/23/2016 | FRAMING | Partial Approval | EAST WING AND SOUTH SIDE OK TO WRAP EXTERIOR OF FRAMING. | |
| 06/17/2016 | FRAMING | Partial Approval | IVRS - Inspection :* SOUTHWEST QUADRANT OK TO WRAP EXTERIOR |
|
| 06/09/2016 | FRAMING | Partial Approval | SECOND FLOOR DECK OK TO POUR. | |
| 06/07/2016 | FRAMING | Partial Approval | WEST WING DECK IS OK TO POUR, EAST WING INCOMPLETE. PLEASE RE-CALL PRIOR TO POUR | |
| 06/02/2016 | FRAMING | Partial Approval | PRELIMINARY - BRACING AT FIRST FLOOR AND DECK OK | |
| 05/06/2016 | FRAMING | Partial Approval | 2ND FLOOR METAL DECK - SCREW PATTERNS GL: H - B/1 -17 OK TO POUR PROGRESS AREAS | |
| 05/02/2016 | FRAMING | Partial Approval | SEVERAL BOLTS AT HOLDDOWNS ARE TOO SHORT TO GET A FULL NUT. (PROVIDE ENGINEER APPROVED FIX) | |
| 04/07/2016 | FRAMING | Partial Approval | PRELIMINARY ONLY - OK TO INSTALL DECKING |