Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T15CM04093

Parcel: 131010250


Addresses:

4802 E 22ND ST


Inspection Status: Approved

Inspection History: FIRE - FINAL

Permit Number - T15CM04093

Inspection Description - FIRE - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
11/30/2015 FIRE - FINAL Approved Asked the contractor representative if any cooking would be done he stated no just a coffee shop only.
Contractor's representative was given the following notice in written on inspection form: No grease vapor cooking allowed until an approved plan and permit pull for a type-1 hood system and fire extinguisher system.

Fire wall all the way to the deck taped and sealed around duct work and conduit, emergency lights worked, panic hardware on doors to rear exit, exit sign place over 2nd door to rear exit, ceiling tiles in place, plans have been changed showing rear meeting room ("B" occupancy) OCC load of 45 and front coffee shop area (occupancy "A-2") OCC load 71.
11/10/2015 FIRE - FINAL Denied Need to exits form coffe shop ( occ load is over 50). 2nd exit must be more than 1/2 the diagnol of the cafe in feet away from the first exit.
2. Second exit must have panic hardware.
3. must place an exit sign over second exit ( south door into A3).
4. need covers over outlets and switch plates.
5. Need tables and chairs arranged for seating ( to determine if occ load is met)
6. ceiling tiles muct be in place
7. There is no one on site to test emergency lights and back up exit sign lighting.
8. Breaker box shall be labled.
10/21/2015 FIRE - FINAL Denied Penetration for flex duct work through fire wall shall be sealed with firestopping to meet the rating of the wall. Other penetrations have this seal, but the duct work does not.
Breaker panel not connected, could not test emergency lights and exit sign back up lighting.
Missing the majority of ceiling tiles in building.
09/11/2015 FIRE - FINAL Denied Plans state the south portion behind the fire wall is to be A-3. General says it will not be a church, it will now be more customer seating. Resubmit ACCURATE plans to reflect use of building.
Also, current attempt to build fire wall is wront. does not go to deck...goes to bottom of another ceiling that is actually 5 feet below the actual deck above. Fire walls must extend from floor to deck.