Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2015 | PLUMBING - ROUGH, SOIL | Approved | 1. DWV WATER TEST PROVIDED 2. BLDG SEWER CONNECTION TO SEPTIC TANK OK, TRACER WIRE PROVIDED 3. STEEL IN FOUNDATION OK |