Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2015 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/10/2015 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 06/10/2015 | PLUMBING - GAS PRESSURE TEST | Denied | BUILDING ADDRESSED AS 2737, CORRECT ADDRESSING. FACTORY COATED PIPING REQUIRED BELOW GRADE, EXPOSE FOR INSPECTION. 12" COVER REQUIRED. SEDIMENT TRAP REQUIRED AT WATER HEATER. TYPE B-VENT REQUIRED FOR WATER HEATER. ALIGN DRAFT DIVERTER OVER VENT OPENING. INSTALL NEW GAS FLEX AT WATER HEATER. ALSO, CO2 DETECTOR REQUIRED. 18' OF METALLIC WATER TUBING REQUIRED AT WATER HEATER. ALSO, SUPPORT TUBING. SUPPORT GAS PIPING DROP AT WATER HEATER. |