Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2015 | PLUMBING - INTERMEDIATE | Approved | ||
| 11/12/2015 | PLUMBING - INTERMEDIATE | Denied | 1. PLUMBING REQUIRES WATER TEST TO TOP OF VENT. 2. TRAP ARM CONNECTION TO VERTICAL REQUIRES SANITARY TEE. (NOT COMBINATION FITTING) 3. FLEX DUCT SHOULD BE FULLY EXTENDED. 4. TRANSITION FROM PVC TO ABS MUST BE WITH MISSION BAND. (NOT GLUE JOINT) |