Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T15CM02521

Parcel: 116033970

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
08/31/2015 BUILDING - FINAL Approved
08/19/2015 BUILDING - FINAL Denied 1. BONDED BUSHINGS ARE REQUIRED AT ALL CONNECTIONS TO BOXES.
2. METER BASE MUST BE INSTALLED.
3. SOLAR BREAKER MUST BE INSTALLED AT THE LAST POSITION AT THE BOTTOM OF BUSS.