Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2018 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 01/17/2018 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | PROVIDE ACCESS GAS LINE COVERED WITHOUT INSPECTION BOND GAS LINE |
|
| 01/10/2018 | PLUMBING - GAS PRESSURE TEST | Denied | LEFT MESSAGE GATES LOCKED NO ACCESS NEXT DENIAL MAY RESULTIN A REFEE |
|
| 01/09/2018 | PLUMBING - GAS PRESSURE TEST | Denied | NO ACCESS RECALL |