Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 08/17/2017 |
BUILDING PRE-SLAB |
|
Approved |
|
| 07/06/2017 |
BUILDING PRE-SLAB |
|
Partial Approval |
FIRST POUR FOR CRANE-IN FILL AT 16" - LEVEL #1: 3500psi CONCRETE. |
| 09/08/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
PUR BACK AT LEVEL #2.5 AT SOUTH EAST STAIRWELL; LEVEL #4.5: 8" BEAM (APPROXIMATELY 4') AT SE CORNER. OK TO POUR PROGRESS AREAS. |
| 07/22/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
2ND LEVEL AT SE CORNER: 10 CABLES REPLACED, SPECIAL INSPECTED. OK TO POUR BACK REPLACEMENT AREA. |
| 07/14/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
CONTROL JOINTS AT LEVELS 3.5 - 4, 4 - 4.5. CLEAN OUT AREAS BEFORE POURING |
| 07/01/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
LEVEL 6 - SLAB AT GL: A - G/ 5.5 - 8 - OK TO POUR PROGRESS AREA. |
| 06/28/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
REBAR SYSTEM AT LEVEL 6, GL: 3.5 - 5.5/ A - G. OK TO POUR PROGRESS AREA. |
| 06/01/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
POST TENSION SYSTEM AT LEVEL #5; GL: A - G/ 1 -4.5; COLUMNS AT B/6 - 7; C/7. OK TO POUR PROGRESS AREAS. |
| 05/19/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
IVRS - Inspection :* |
| 05/12/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
POST TENSION CABLE SYSTEM AT GL; 8/A - G; A/ 4.5 - 8; 4.5/A-G; G/1 - 4.5; 1/A-G; A/1-4.5. OK TO POUR PROGRESS AREA |
| 05/05/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
GL 3.5-5.8/A-G 3RD TO 4TH FLOOR. |
| 04/28/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
PT SLAB ON 3RD FLOOR GL 4.5/ A-G. |
| 04/04/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
Ramp and 2nd floor Gl a-g/1-2.3 d-g/1-4 |
| 03/25/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
IVRS - Inspection :* |
| 03/17/2016 |
BUILDING PRE-SLAB |
|
Partial Approval |
IVRS - Inspection :* |