Permit: T15CM02281

Parcel: 117062000


Addresses:

151 E BROADWAY BL

Inspection Status: Approved

Inspection History: STEM WALL/RETAINING WALL

Date Description Inspector Results Comments
08/17/2017 STEM WALL/RETAINING WALL Approved
08/24/2016 STEM WALL/RETAINING WALL Partial Approval GROUT POCKETS AT EAST STAIRWELL - LEVELS 4.5 - 5.5. NEED TO DRILL AND EPOXY (4 1/2" WITH #5 REBAR) IN POCKETS WHERE DBR'S COULD NOT BE LOCATED - AS PER ENGINEER'S INSTRUCTIONS.
08/24/2016 STEM WALL/RETAINING WALL Partial Approval MASONRY PRE-GROUT: SOUTH WALL GL:1-4; ROOM #142 AT 4'8", NORTH WALL AT GL: 4 AT 9' TOPPED OUT. WEST WALL AT GL C - E/1 (RFI #189, DETAIL #229 AT 22'8"; ROOM #404 TOPPED OUT. OK TO GROUT PROGRESS AREAS.
08/18/2016 STEM WALL/RETAINING WALL Partial Approval GROUND LEVEL RAMP APRON - SLAB ON GRADE. OK TO POUR PROGRESS AREA.
08/11/2016 STEM WALL/RETAINING WALL Partial Approval CONTROL JOINT AT LEVEL 5 - 5.5; ELECTRIC ROOM #142, EXTERIOR PAD. OK TO POUR PROGRESS AREAS.
08/03/2016 STEM WALL/RETAINING WALL Partial Approval LEVEL 3, ROOM #367, ELECTRIC ROOM FLOOR; LEVEL #6 EAST STAIRS POUR BACK; EXPANSION JOINT AT LEVER 4 - 4.5; SCISSOR WALL AT LEVEL 2 UP TO LEVEL 3; CRASH WALL AT LEVEL #2 ( EAST OF STAIRWELL TO COLUMN #8, COLUMN A - B. OK TO POUR PROGRESS AREAS.
07/29/2016 STEM WALL/RETAINING WALL Partial Approval CRASH WALLS AT LEVEL 2 - 2.5 NORTH AND SOUTH WALLS. OK TO SET FORMS AND POUR.
07/28/2016 STEM WALL/RETAINING WALL Not ready for Inspection CONTRACTOR CANCELLED
07/22/2016 STEM WALL/RETAINING WALL Partial Approval SE STAIRWELL AT LEVEL6 - POUR BACK; GL: G/7. OK TO POUR PROGRESS AREA.
07/22/2016 STEM WALL/RETAINING WALL Partial Approval 3 COLUMN FOOTINGS AT GL: G (24" X 24" X 18"). OK TO POUR PROGRESS AREAS.
07/19/2016 STEM WALL/RETAINING WALL Partial Approval 2ND LEVEL (NORTH) EXPANSION JOINT POUR - BACK. OK TO POUR PROGRESS AREA.
06/21/2016 STEM WALL/RETAINING WALL Partial Approval LEVEL 6 POOL FLOOR AND POUR 1 (WEST END) OK TO POUR.
05/31/2016 STEM WALL/RETAINING WALL Partial Approval CMU WALL IN ELEVATOR #3; 2ND LIFT AT 9'4"; OK TO GROUT.
05/23/2016 STEM WALL/RETAINING WALL Not ready for Inspection CONTRACTOR CANCELLED
05/19/2016 STEM WALL/RETAINING WALL Not ready for Inspection CONTRACTOR CANCELLED
05/16/2016 STEM WALL/RETAINING WALL Partial Approval REBAR PLACEMENT FOR 4TH FLOOR WEST STAIRWELL, OK TO SET FORMS AND POUR
05/13/2016 STEM WALL/RETAINING WALL Partial Approval 13 COLUMNS AT GL: B/1, C/1-2, D/1. E/ 1, 3, 4; F/1, 2, 4;
G/ 1, 2, 4; ELEVATOR #3
05/12/2016 STEM WALL/RETAINING WALL Partial Approval 10 COLUMNS AT GL; A/1,2,3,4; B/2,3,4,; C/2,4, D/3. OK TO POUR PROGRESS AREAS.
05/11/2016 STEM WALL/RETAINING WALL Partial Approval ELEVATOR 1 AND 2 3RD TO 4TH.
05/11/2016 STEM WALL/RETAINING WALL Partial Approval
05/10/2016 STEM WALL/RETAINING WALL Partial Approval 11 COLUMES GL A/6-7-8, B/5-6-7-8, C/5-7-8, G/6.
05/04/2016 STEM WALL/RETAINING WALL Partial Approval WEST STAIRWELL 1 COLUME AT WEST END
05/03/2016 STEM WALL/RETAINING WALL Partial Approval ELEVATOR #3 3RD TO 4TH FLOOR, 3 COLUMES,
04/27/2016 STEM WALL/RETAINING WALL Partial Approval Elevator core GL C/6-7, stairwell GL F-G/6.4-6.8 all 2nd to 3rd floor.
03/24/2016 STEM WALL/RETAINING WALL Partial Approval GL A.5/3-4.5
03/11/2016 STEM WALL/RETAINING WALL Partial Approval GL b.5/6-7 6.4/b.8-a.8
03/04/2016 STEM WALL/RETAINING WALL Partial Approval IVRS - Inspection :*