Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 04/06/2017 | PLUMBING - ROUGH, SOIL | Denied | 1- THE LAVATORY AND TUB DRAINS SHALL CONNECT HORIZONTALLY TO THE 3" SOIL DRAIN LINE. YOU MAY DIG A DEEPER TRENCH AND LOWER THESE DRAINS OR RAISE THE 3" BLDG. SOIL DRAIN LINE. 2- RETEST THE SYSTEM. |
|
| 03/27/2017 | PLUMBING - ROUGH, SOIL | Denied | 1- CAN NOT CONNECT A DRAIN INTO A VENT. 2- THE LAVATORY,TUB AND SHOWER DRAIN SHALL ALL CONNECT HORIZONTALLY ON BRANCH WASTE LINES. THESE DRAINS CAN NOT BE WET VENTED OFF THE 3" VERTICAL VENT FOR THE WATER CLOSET. 3- RETEST THE SYSTEM. |