Permit: T15CM01844

Parcel: 12112043B


Addresses:

5251 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
09/28/2015 ENGINEERING - FINAL Approved
09/24/2015 ENGINEERING - FINAL Not ready for Inspection MET WITH THE CONTRACTOR ON SITE AND REMINDED HIM THAT I WOULD NOT BE SIGNING OFF THE PROJECT TILL ALL OF THE OVERHEAD WORK WAS COMPLETED AT THE MAIN ENTRANCE INTO THE BUILDING. CURRENTLY THEY ARE WORKING ON PREPPING THE AREA FOR PAINT AND SHOULD HAVE IT COMPLETED BY TOMORROW, MIKE WILL RE-INSPECT THE SITE TOMORROW TO VERIFY THAT ALL WORK IS COMPLETE AT THIS TIME.
09/23/2015 ENGINEERING - FINAL Not ready for Inspection ENGINEERING FINAL NOT TO BE GIVEN TILL THE EXTERIOR WORK IS COMPLETED. CURRENTLY THE CONTRACTOR IS WORKING ON PLACING PAVEMENT IN ALL THE CUTOUT AREAS, HE WILL ALSO NEED TO STRIPE THE PARKING LOT ONCE THE PAVEMENT IS COMPLETE. THE LAST ITEM TO BE WORKED ON IS THE OVERHEAD STRUCTURE AT THE ENTRANCE INTO THE STORE. ACCORDING TO THE CONTRACTOR ALL THE WELDING IS COMPLETE, THE ONLY THING LEFT TO BE COMPLETED IS THE FINAL COAT OF PAINT. I HAVE ADVISED THE CONTRACTOR THAT ANY WORK OVER THE ENTRANCE WILL CAUSE FOR THE ENGINEERING TO REMAIN IN A NOT READY STATUS TILL IT IS COMPLETE.