Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2015 | ELECTRIC - FINAL | Approved | PER INSPECTION BY MRAMB | |
| 03/23/2015 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/23/2015 | ELECTRIC - FINAL | Denied | A PLAN IS REQUIRED SHOWING ROOF CALCS & DUCT SIZING. PROVIDE PROPER FUSE SIZE. ID BREAKERS. PROVIDE PROPER WIRING FROM PANEL TO J-BOX. INSTALL ROOFTOP RECEPTICLE. CONDENSATE PIPING REQUIRES PROPER TERMINATION, CLEARANCE ABOVE ROOF & UV PROTECTION | |
| 03/17/2015 | ELECTRIC - FINAL | Not ready for Inspection | NEED LADDER TO ACCESS ROOF |