Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2015 | PLUMBING - ROUGH, SOIL | Approved | ||
| 04/29/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | 1. 2 WAY CLEANOUT IS NOT POSSIBLE TO CLEAN BETWEEN SWEEPS. INSTALL SINGLE FITTING CLEANOUT 2. PROVIDE CLEAN BACKFILL MATERIAL CAN RE-CALL WITH PRE-SLAB INSPECTION. |