Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2015 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 03/27/2015 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/27/2015 | MECHANICAL - FINAL | Denied | PROVIDE A ROOF JACK AT CONDENSATE PENETRATION. USE PURPLE PRIMER ON ALL PVC FITTINGS PRIOR TO GLUE. SUPPORT PVC EVERY 4' WITH REDWOOD OR PRESSURE TREATED WOOD & USE TWO-HOLE CLAMPS TO SECURE. PAINT ALL EXPOSED PVC W/ LATEX PAINT. BE SURE ALL SECTIONS OF DRAIN HAS 1/8" PER FT SLOPE. PROVIDE MIN R8 2" DUCT LINER IN EXPOSED DUCT ON ROOF. DO NOT USE WHITE WIRE FOR POWER TO 240 V A/C UNIT. PROVIDE A PRESSURE TEST ON ALL NEW GAS PIPING. PROVIDE THE REQUIRED DRAWING FOR NEW A/C ON ROOF. PROVIDE A HIGH COMBUSTION AIR OPENING INTO WATER HEATER CLOSET. WATER HEATER VENT NOT CORRECTLY INSTALLED |