Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T15CM00996

Parcel: 121110210


Addresses:

4937 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
02/06/2020 ENGINEERING - FINAL Approved
01/31/2020 ENGINEERING - FINAL Continued Met with owner and concrete contractor about ADA parking area.
10/08/2019 ENGINEERING - FINAL Not ready for Inspection Parking still over 2%. Handrail for ramp is up and in compliance.
04/08/2019 ENGINEERING - FINAL Not ready for Inspection RON AND I MET ONSITE AND LOOKED AT WHAT THE ISSUES ARE AT THIS TIME.
1) THERE IS AN ENTRANCE ON THE NORTHSIDE OF THE SOUTH PARKING LOT THAT IS NOT SHOWN ON THE APPROVED DEVOLPMENT PACKAGE. THIS PLAN NEEDS TO BE REVISED TO SHOW THE CURRENT CONDITIONS AS THEY ARE AND REFLECT THE REQUIRED MODIFICATIONS TO MEET ALL CODE REQUIREMENTS.
2) A RAMP AND LANDING HAS BEEN CONSTRUCTED THAT DOES NOT MEET CURRENT CODES. WE HAVE ADVISED THE OWNER OF THE AREAS THAT ARE NON-COMPLIANT AT THIS TIME, RAILING, SLOPES IN AREAS NON-COMPLIANT.
3) THE CLEAR SPACE IN THE DOORWAY LANDING DOES HAVE THE MINIMAL FLAT AREAS ON THE SIDES OF THE DOORWAY PER CODES.
4) THE RAIL FOR THE RAMP IS BARRIER RAIL NOT HANDRAIL. THEY NEED TOO ADD THE HANDRAIL AT 34 - 38 INCHES AND PROVIDE A KICKPLATE WITH AN OPENING LESS THAN 4 INCHS ABOVE THE SIDEWALK.
THIS IS NOT TO BE CONSIDERED A FULL LIST OF ITEM THAR MAY INCORRECT. ARE-INSPECTION OF THE SITE WILL BE DONE ONCE REVISDED DRAWINGS HAVE BEEN PROVIDED TO BE UTILIZED DURING ANOTHER FINAL INSPECTION
04/05/2019 ENGINEERING - FINAL Not ready for Inspection ADA parking over 3% slopes. Landing at bottom of ramp over 2%. Top landing at doorway not per code for opening door. Back up parking area does not have 24 foot Pal Per approved plans. Provide revision for door at top of ramp not on approved plans. List of corrections may not be complete provide revised set of plans and make correctionsFor final.
04/05/2019 ENGINEERING - FINAL Not ready for Inspection I DROVE TO THE SITE AND LOOKED AT IT TO VERIFY WHAT THE ISSUES ARE AT THIS TIME. THERE IS AN ENTRANCE ON THE NORTHSIDE THAT IS NOT SHOWN ON THE APPROVED DEVOLPMENT PACKAGE. A RAMP AND LANDING HAS BEEN CONSTRUCTED THAT DOES MEET CURRENT CODES. RON AND I WILL VISIT THIS SIET ON MONDAY TOO ADVISE THE OWNER WHAT HE NEEDS TO DO TO CORRECT THIS SITUATION, AND BRING THIS SITE INTO COMPLIANCE.
10/08/2018 ENGINEERING - FINAL Not ready for Inspection Provide City approved plans and complete the work specified
04/10/2018 ENGINEERING - FINAL Not ready for Inspection MUST COMPLET DEVELOPMENT PACKAGE AND HAVE ALL CHANGES AP BY COT.
11/13/2017 ENGINEERING - FINAL Not ready for Inspection MET WITH BILL TAYLOR ON SITE.
10/24/2017 ENGINEERING - FINAL Not ready for Inspection COMPLET ALLL WORK ON PAGE 1 & 2 OF 5. AND DP15-0021.