Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2015 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/04/2015 | PLUMBING - ROUGH, SOIL | Approved | CORRECTIONS HAVE BEEN MADE. OK TO BACKFILL & POUR SLAB | |
| 02/26/2015 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 02/26/2015 | PLUMBING - ROUGH, SOIL | Denied | 3" CONN REQ AT WASHER DRAIN. 3" WASTE REQ 3" CO. FURNCO COUPLINGS NOT LISTED FOR INSDIE OF BUILDING. LISTED TRANSITION COUPLINGS REQ AT C1 TO P1. INSTALL FUTURE TEST FITTINGS WHEN TESTING IN SECTIONS. DRY VENT SHALL RISE VERTICALLY & 6" ABOVE FLOOD LEVEL |