Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T15CM00873
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/04/2015 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
03/04/2015 | PLUMBING - ROUGH, SOIL | Approved | CORRECTIONS HAVE BEEN MADE. OK TO BACKFILL & POUR SLAB | |
02/26/2015 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
02/26/2015 | PLUMBING - ROUGH, SOIL | Denied | 3" CONN REQ AT WASHER DRAIN. 3" WASTE REQ 3" CO. FURNCO COUPLINGS NOT LISTED FOR INSDIE OF BUILDING. LISTED TRANSITION COUPLINGS REQ AT C1 TO P1. INSTALL FUTURE TEST FITTINGS WHEN TESTING IN SECTIONS. DRY VENT SHALL RISE VERTICALLY & 6" ABOVE FLOOD LEVEL |