Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2017 | BUILDING - FINAL | Approved | ||
| 03/13/2017 | BUILDING - FINAL | Denied | DOUBLE WALL B-VENT IS REQUIRED OUTSIDE OF THE CABINET. FLEX HOSE CANNOT GO THROUGH THE CABINET, HARD PIPE ONLY. |
|
| 03/03/2017 | BUILDING - FINAL | Not ready for Inspection | exterior electrical light recepticle is open, install cover or fixture. label breakers. reconnect exsisting ufer hose bibs require vacuum breakers type B vent is required for wh new RTU requiers an outlet 306.5.2 imc exposed plastic pvc and abs require uv protection |