Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2015 | ENGINEERING - FINAL | Approved | ||
| 11/18/2015 | ENGINEERING - FINAL | Partial Approval | COMPLETE THE SITE AS SHOWN ON THE APPROVED PLAN PRIOR TO CALLING IN FOR THE FINAL. THIS SITE IS OKAY FOR A TEMPORARY C OF O BUT NOT FOR THE FINAL APPROVAL. THE CONTRACTOR IS AWARE OF THE SIDEWALK AND HANDICAP ACCESS ITEMS THAT NEED TO BE ADDRESSED PRIOR TO THE FINAL APPROVAL. | |
| 10/27/2015 | ENGINEERING - FINAL | Continued | 1) LOOKED AT FORMS FOR VERT CURB ALONG NORTH SIDE OF BLDG - INSTALLED PER APPROVED PLANS OK TO POUR CONCRETE. 2) ENSURE RAILING IS INSTALLED ALONG BOTH SIDES OF THE HC ACCESS RAMP AT REAR OF BLDG |
|
| 10/15/2015 | ENGINEERING - FINAL | Continued | 1) FOOTINGS AND BASE FOR ADA ACCESS RAMP AT REAR OF BLDG OK, OK TO POUR CONCRETE. 2) SLOPE MEETS ADA REQUIREMENTS OF 1:12 OR 8.33% AND THE APPROVED PLANS. |
|
| 09/24/2015 | ENGINEERING - FINAL | Not ready for Inspection | MET CREW ON SITE AND DISCUSSED THE WORK THAT THEY HAVE TO COMPLETE PRIOR TO THE FINAL FOR THIS SITE. CURRENTLY THEY ARE FORMING HANDICAP ACCESS RAMPS ON THE WEST SIDE OF THE BUILDING. PER THE APPROVED PLANS THESE 2 RAMPS WILL BE POURED WITH A 12:1 SLOPE RATIO FOR 15' FEET. I ADVISED THEM TO CHECK WITH THE ENGINEER OF RECORD FOR THIS SITE PRIOR TO POURING THE CONCRETE. |