Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2016 |
ENGINEERING - FINAL |
|
Approved |
|
| 03/08/2016 |
ENGINEERING - FINAL |
|
Continued |
INSTALL HC PARKING, VEHICLE PARKING, AND BIKE PARKING PER PLAN |
| 02/11/2016 |
ENGINEERING - FINAL |
|
Denied |
A STAIRWAY HAS BEEN CONSTRUCTED AT THE SOUTHWEST CORNER OF THE BUILDING THAT BLOCKS THE ADA ACCESSIBLE ROUTE FROM THE WEST SIDE PARKING AREA. REMOVE THIS STARIWAY AND HAVE APPROVED REVISIONS DONE TO THE PLANS THAT REFLECT AN ACCEPTABLE CONDITION FOR BOTH ACCESS AREAS. |
| 02/08/2016 |
ENGINEERING - FINAL |
|
Partial Approval |
COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS FOR THE FINAL ON THIA SITE. |