Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2015 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 07/15/2015 | BUILDING - FINAL | Denied | THE GARBAGE DISPOSAL DRAIN HAS BACK PITCH. STRAP THE DISHWASHER HOSE TO UNDERSIDE OF COUNTER TOP. PROVIDE A 90 DEGREE ELBOW AT CONDENSATE TERMINATION. PROVIDE A TRAP IN CONDENSATE DRAIN. PROVIDE AN OVERFLOW SENSOR IN SECONDARY OUTDOORS ON LINE SET. USE A PRETECTIVE COATING EXCEED 3' LENGTH. PROVIDE SCREENS IN CONBUSTION AIR LOUVERS. INSTALL WASHER AND DRYER MIN 18' ABOVE GARAGE FLOOR. PROVIDE A CO2 SENSOR. RELOCATE A/C DISCONNECT FROM BEHIND CONDENSING UNITS. PROVIDE A PANEL SCHEUDLE. ALL BRANCH CIRCUITS TO HAVE ARE FAULT BREAKERS PER 2012 IRC. OUTDOOR LIGHTS MUST BE SHIELDED. |
|
| 07/13/2015 | BUILDING - FINAL | Not ready for Inspection | NO ONE PRESENT AT 12:45. RECALL |