| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2015 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/11/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 03/11/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | SEWER & CONN OK. RECALL AFTER REV | |
| 01/29/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 01/29/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | CHANGE OF LAV LOCATION - OK TO COVER | |
| 01/27/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 01/27/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | IN BUILDING OK TO COVER. RECALL INSPECTION FOR SEWER & TIE-IN | |
| 01/26/2015 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/26/2015 | PLUMBING - ROUGH, SOIL | Denied | SOLVENT CEMENT FITTINGS REQ IN CONCEALED LOCATION. TEST SHALL BE IN PLACE PRIOR TO INSPECTION | |
| 01/23/2015 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/23/2015 | PLUMBING - ROUGH, SOIL | Denied | DRY VENT SHALL CONNECT ABOVE FLOW LINE. EACH DRY VENT SHALL RISE VERTICALLY TO 6" ABOVE FIXTURE PRIOR TO HORIZ OFFSET. A COMBO FITTING IS REQ IN HORIZ POSITION. A SANTEE OR LOW HEEL MAY ONLY BE USED IN VERT CORRECT SLOPE AT LAV. PLAN SPECIFIES INDIVIDUAL VENTS. PLAN REV REQ FOR ADDED FIXTURE & LAYOUT CHANGE. | |
| 01/21/2015 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/21/2015 | PLUMBING - ROUGH, SOIL | Denied | PROVIDE PROPER USE OF DRAINAGE FITTINGS IN HORIZONTAL POSITION (COMBOS). NOT PER PLAN: ADDITIONAL FIXTURES, FIXTURE LOCATION, & ROUTING. PLAN SPECIFIES A SEPARATE VENT FOR EACH FIXTURE. 1/4" PER SLOPE MAX ON HORIZONTAL WEST VENT. REDLINE ALL CHANGES TO PLAN. CORRECT SLOPE & PIPE SUPPORT |