Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2016 | FIRE SPKLR - OH PIPING & HYDRO | Approved | All corrections have been made ( heads replaced and added per required on 5/12/16). | |
| 05/12/2016 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Hydro passed 200psi>2hrs OH DENIED 1) Painted upright over R.R. next to lobby, E. side. 2) Painted upright hallway, R.R. on W. side, in hallway. 3) Need more upright coverage, office, south side of bldg, in-between bullpen and O.M. 4) No upright coverage in break room, north side of bldg. 5) Blocked upright, hallway, outside conf. room, east side of bldg. |
|
| 04/26/2016 | FIRE SPKLR - OH PIPING & HYDRO | Denied | Made appt with contractor; no one on site when I arrived. Must call it in again. |