Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG PIPING FLUSH
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2015 | FIRE SPKLR - UG PIPING FLUSH | Approved | ||
| 12/01/2015 | FIRE SPKLR - UG PIPING FLUSH | Denied | Piping wraped OKAY to bury | |
| 11/30/2015 | FIRE SPKLR - UG PIPING FLUSH | Denied | Need to wrap all ductile pipe and mechanical joint fittings with 10ml plastic and 10 ml tape no exposed metal to ground. Fire inspector will need see wrapped metal parts before burying the trench. |