Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
Permit Number - T15BU01356
Inspection Description - FIRE - ALARM FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/10/2018 | FIRE - ALARM FINAL | Approved | ||
03/12/2018 | FIRE - ALARM FINAL | Partial Approval | fire alarm system needs to shut down the Musac system. FS: provide documentation regarding all riser calculations are the most current. Provide calc plates for riser 3 to the mezanine. TFD to check on obdtructed head issue and fire pump test header ;ocation/ General: Signs need to be installed : FDC , FDC LOCATIONS, RISER INSIDE AND RISER NUMBER; FIRE PUMP ROOM, TEST HEADER Address needs to be on the South side |
|
08/16/2016 | FIRE - ALARM FINAL | Partial Approval | PA. Shell is complete/finaled/approved. This permit will remain open until the entire alarm is finaled/approved. Remaining items include: 1) Test BAF to make sure shuts down on general alarm. 2) Test converyors shut down on general alarm. 3) Need to test any additional tamper and water flow switches that may be added for mezz. 4) Need as builts submitted at the end of job. 5) Need another 72 cert for entire alarm. |
|
08/05/2016 | FIRE - ALARM FINAL | Denied | Not ready. PIV's not working. Home goods staff did not know how to use PA to advise workers of fire alarm testing. No sprinkler worker on site to test water flow and tamper for new rack system. They were strongly advised to pretest everything before they call it in and to have the proper people on site to conduct testing. All items on previous inspection still need to be tested. Also need the following added to the list. 1) Test BAF to make sure shuts down on general alarm. 2) Test converyors shut down on general alarm. 3) Need to test tamper and water flow on riser for racks. 4) Need as builts submitted at the end of job. |
|
05/19/2016 | FIRE - ALARM FINAL | Partial Approval | Approved all risers today. Sprinkler system has been finaled. Still needs the following: 1) PIV's to be rewired correctly after check valves are installed. 2) lock out on breaker. 3) 72 cert. 4) add phone and acct # on inside of fire panel. 5) date batteries. 6) adding smoke detection in raised floor. need to check these with fire alarm and preaction system if connected. 7) ducts in CRAC units to be supervised. 8) new module for wall mount PIV risers 20/21 needs to be programmed. |
|
05/13/2016 | FIRE - ALARM FINAL | Partial Approval | Approved the following today: 1) OS&Y's 2) Preaction system, smokes. 3) Riser 5 & 6 approved. Still needs the following: 1) Remainder of north risers and SW riser for "fingers" 2) PIV's 3) Lockout on breaker 4) label door (FACP) 5) 72 cert 6) add phone and acct number inside panel 7) date batteries 8) need smoke detection in raised floor 9) duct detectors in CRAC units to be supervised |
|
05/06/2016 | FIRE - ALARM FINAL | Partial Approval | PA only. Still need to test the following: 1) preaction/computer room smokes. 2) all north bay wet systems, tampers, flows, etc... 3) PIV's 4) OS&Y's 5) need lock out on breaker. 6) label door (FACP) 7) verify all signals 8) need 72 cert 9) add phone & acct #'s to inside of panel 10) date batteries |
|
12/16/2015 | FIRE - ALARM FINAL | Denied | Need to monitor all OSY's at the back flows for the fire lines X 4 (Tamper switches). |