Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2015 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
| 11/12/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Passed pressure test - 200 psi for 2 hrs. 1. must move head blocked by ventilation unit in Southern most suite ( see plans) 2. will submit revision of reflected ceiling plan in Northern most suite ( Verizon Store) to Harvey . They are reducing number of heads (going three heads wide instead of Four) and will also show the auxillary drain in far North west corner of this same suite. They may place drop ceiling in this Verizon side and keep an opening where the auxillary drain will be located. |