Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T15BU01198
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 02/17/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | UG hydro/piping approved for FS1 and FS2 (see plans). | |
| 01/13/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | FS3 ( see plans) from where city will tie in up to stub up - was pressured up since yesterday at 200 lbs. read at 9 am - 220 lbs. All pipes/connections as per approved plans. May back fill this section. Still need to lay FS |
|
| 01/12/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Not ready for Inspection | On site at 9 am; was only pressured up for 1 hr. | |
| 01/11/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | 1.Was not pressured up 2.pipe has already been backfilled from city connection for about 10 feet but then exposed at the next joint before the stub up. Bell is secured properly ( with stabalizer) and stub up is in thrust block. |