Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2015 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
| 11/04/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Passed hydro, overhead needs correction. Add head in hallway on other side of drop down wall ( upright) Add head on other side of added wall and ductwork blocking in kitchen Add head in kitchen other side of vent duct dropped down Verify that the flex duct work in kitchen is not blocking uprights See plans for comments. NS |
|
| 10/27/2015 | FIRE SPKLR - OH PIPING & HYDRO | Denied | DENIED: 1. A NEW HEAD NEEDS TO BE ADDED TO THE NORTH SIDE OF THE DUCT WORK. CURRENTLY A 10FT SPAN EXISTS. 2.SYSTEM HAD NOT BEEN PRESSURIZED PRIOR TO ARRIVAL, UNABLE TO DO HYDRO. |