Inspection History Details
Inspection Status: Partial Approval
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Bldg. #1 UG done 200 PSI for 2 hours needs tracer wire installed Bldg.#2 Partial approval UG part only and was tested 200 PSI for 2 hours, still need UG piping installed over building to riser and needs to be tested at 200 PSI for 2 hours again. OKAY to bury UG piping still needs tracer wire installed. |