Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | dug up pipe end from when developed area was pressure tested, before building came in. Addition of 23 LF of 4 " C900. Pressure tested at 200 psi for more than 2 hrs. Was pressured up at 10 AM - read at 2:52 PM |
|
| 07/13/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Not ready for Inspection | On site at 1:30PM Contractor left site after 1:00PM did not think fire inspector was going to show. | |
| 07/10/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | #2 and #3 (20 ft and 25 ft sections of ductile iron passed hydro. #1 on plans ( 60 ft section ) FAILED hydro. No thrust blocks at stub up because contractor says the builders who come in may not come in for a few years and may move service line and stub up. If no thrust blocks, permit can not be finalled and will remain partially open until someone installs the thrust blocks per the approved plans. |
|
| 07/14/2014 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval |