Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2015 | FIRE SPKLR - OH PIPING & HYDRO | Approved | approved. see records. | |
| 10/05/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 200 PSI and inspection for the mezzanane only | |
| 09/16/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 1. passed pressure test - 220 psi for nearly 24 hrs 2. mezzanane not framed out yet, so that line has yet to be installed. |
|
| 09/11/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | removed head that was within 6 ft in mens rest room. | |
| 09/10/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | added head btwen duct work in ceiling over womens room. The head added in the mens room is within 6 ft of another head and flex duct work is lower so that the heads will now 'see' eachother and possibly cold solder one another. Keep flex duct work lower than heads so pattern is not blocked and cap off newly installed upright so that the original heads on the plans will be sufficient. NS |
|
| 09/04/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 1.Need 1UR head btween ducts in womens room. 2.Need 1 UR head bteen flex duct and North most head in mens restroom. |
|
| 07/02/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | IVRS - Inspection :* | |
| 07/02/2015 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | For Classrooms... HYDRO PASSED Pressured up at 11:15 AM today. Read at 1:34 PM - 210 psi Overhead is a PARTIAL APPROVAL 1. 3 uprights need to be flipped to the NW to provide for no more than 7 feet 5 inches. See plans for details. |