Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2015 | FIRE SPKLR - FINAL | Approved | Tested flows and tampers ( PIV and Riser) 30 seconds flow test 40 static to 35 on 2 inch drain test. Approved all heads |