Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2015 | FIRE SPKLR - FINAL | Approved | To clear permit | |
| 05/20/2015 | FIRE SPKLR - FINAL | Partial Approval | Partial Approval given for phase #2 only as marked on approved plans - okay to use building | |
| 04/22/2015 | FIRE SPKLR - FINAL | Not ready for Inspection | STILL HAVE ANOTHER PHASE; ADD SPRINKLERS TO THE NW SIDE OF NEW BUILDING. NS |
|
| 04/16/2015 | FIRE SPKLR - FINAL | Not ready for Inspection | final was called in prematurely. Overhead pressure test on addition to system passed ( 205 psi recorded at noon) was pressurized at 8:30 am Checked all heads installed above and below. Upright in ceiling space on NE corner near the door was obstructed by flex duct work. Must be above duct work to have coverage of space. See plans for specific location. |