Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | 200 PSI FOR 2 HOURS APPROVED ON 04.29.2015 INSPECTION | |
| 04/30/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Cancelled | IVRS - RI canceled | |
| 04/30/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | Plastic wrap and tracer wire in place | |
| 04/29/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | Need 36" depth for the fire line because of traffic driving over the line, contractor asked if they can us a slurry to meet the requirements for 36 inch burial I advised if they get an engineer to write a letter stating that slurry poured over the piping will meet the requirements for 36 inch burial depth then this will be approved. Also advised the contractor to ploy-plastic cover all piping so as the slurry can't damage the piping. 200 PSI test for 2 hours approved if slurry is approved an engineer as equal to 36 inch burial depth. |
|
| 04/27/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | According to the approved plans piping bury to 36" as of today only 28" need to bury 36 inches |