Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SITE REVIEW
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2014 | SIGN SITE REVIEW | Approved | PREVIOUS REQUIREMENTS HAVE BEEN MET. APPLICATION HAS BEEN APPROVED. | |
| 09/24/2014 | SIGN SITE REVIEW | Correction Required | The following requirements must be added to the application packet to continue the permit review 1.Engineering required Sec. 3-18. Application for permit. C. Engineered plans and specifications. The following signs shall require engineered plans and calculations sealed by an engineer and/or architect registered in the State of Arizona: 1. Detached or freeway signs when the area of the sign or the aggregate area of all signs on the sign structure, including the pylon and/or pole cover, exceeds sixty (60) square feet. 2. Measurements required The drawing only shows the V.O. (visible opening/ 6.1') width of the sign cabinet. The actual width of the whole monument sign must be included. |