Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: SIGN INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/17/2014 |
SIGN INSPECTION |
|
Not ready for Inspection |
SIGNS STAFF HAS NOT RECEIVED THE FINAL RETURNED SPECIAL INSPECTION CERTIFICATE SEALED FROM LYLE TWEET/STATING JUSTIN MANCHESTER HAS INSPECTED THE BOLTING OF THE SIGN AND APPROVED IT ON X DATE. PLEASE RETURN THIS SHEET VIA SCANNED PDF/EMAIL TO HEATHER.THRALL@TUCSONAZ.GOV OR PLEASE DROP IT OFF AT THE SIGN PERMIT COUNTER. STRUCTURAL DIVISION WILL BE GIVEN THE FORM FOR FINAL SIGN OFF, AND AN UPDATE WILL POST HERE IF APPROVED. THANK YOU. (INSPECTOR LEDONNE REPORTED NO OTHER CONCERNS RELATING TO FINALING THIS SIGN OTHER THAN THE CERT.) |
| 06/27/2014 |
SIGN INSPECTION |
|
Not ready for Inspection |
DO NOT FINAL UNTIL SPECIAL INSPECTION DONE AND CERTIFCATE RETURNED TO STAFF. SPECIAL INSPECTION REQUIRED FOR ATTACHMENT, DRAWINGS INDICATE EPOXY W/ RODS - CERTIFICATE INDICATES "BOLTING" INSPECTION. |