Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SITE REVIEW
Permit Number - T14OT00107
Inspection Description - SIGN SITE REVIEW
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2014 | SIGN SITE REVIEW | Approved | TOTAL $721.12 | |
| 07/29/2014 | SIGN SITE REVIEW | Continued | TOOK PHOTOS FOR ANDY. | |
| 06/03/2014 | SIGN SITE REVIEW | Partial Approval | Submit site plan indicating set-backs for both freestanding monument signs on Grant & Tanque Verde Roads. | |
| 06/02/2014 | SIGN SITE REVIEW | Partial Approval | SET BACK ONLY CHECK SET BACK ON LAY OUT INSPECTION. | |
| 04/18/2014 | SIGN SITE REVIEW | Correction Required | FREESTANDING SIGNS ARE REQUIRED TO INCLUDE WITH SUBMITTALS: A scaled site plan. The site plan submitted indicates that it is not to scale. Verify that plan is in a recognizable scale. Sec. 3-61. Freestanding signs. Low profile type sign Minimum setback from curb to leading edge of sign: Maximum Allowable Height 7'6" Distance from Curb to Leading Edge of Sign 15' The setback indicated on site plan is 13' revise as necessary. Height of sign is measured from a top of street curbing. Indicate on drawing(S) the height measurement from curb. |
|
| 01/29/2014 | SIGN SITE REVIEW | Correction Required | FREESTANDING SIGNS ARE REQUIRED TO INCLUDE WITH SUBMITTALS: A scaled site plan indicating street frontage, property lines, sight visibility triangles, proposed and existing rights-of-way, location of sign on property and relationship of proposed sign to ingress and egress points. Previously approved site plan can be found @ http://www.tucsonaz.gov/PRO/pro/devactionsrch.jsp Provide construction details of the sign; method of attachment (details), including number, size and type of anchors being used; weight of sign or components; and character of structural members to which attachment is to be made. Include footing details for all freestanding and directional signs. For illuminated signs, complete electrical data, including type of illumination, number of fixtures, operating voltage, number of circuits, total line load and location of electrical disconnect(s). Contractors must provide: Certificate of insurance on file with the Development Services Department and Business privilege license with the City of Tucson Sec. 3-18. Provide appropriate documentation. |